Losi RC Inspired
ARRMA
Axial
Spektrum
Pro-Line racing
E-Flite
Tower Hobbies

FALL INTO SAVINGS

Save Up To $80 Off!

BACK-TO-BACK WINS UNLOCK THE NO. 19 FREE BIRD LIVERY

Limited-Time Pre-Order Ends In:

GREAT GIFTS UNDER $100

Holiday Shopping Made Easy

FALL INTO SAVINGS

Save Up To $80 Off!

BACK-TO-BACK WINS UNLOCK THE NO. 19 FREE BIRD LIVERY

Limited-Time Pre-Order Ends In:

GREAT GIFTS UNDER $100

Holiday Shopping Made Easy

Discontinued

ParkZone SV80 Long Lead Servo: T-28/P-51D/Extra 300/F4F

ParkZone - PKZ1081

ParkZone SV80 Long Lead Servo: T-28/P-51D/Extra 300/F4F Features

  • The Spitfire Mk IX uses this servo for its Aileron controls
  • Approximately 400mm lead length