Losi RC Inspired
ARRMA
Axial
Spektrum
Pro-Line racing
E-Flite
Tower Hobbies

FALL INTO SAVINGS

Save Up To $80 Off!

BACK-TO-BACK WINS UNLOCK THE NO. 19 FREE BIRD LIVERY

Limited-Time Pre-Order Ends In:

GREAT GIFTS UNDER $100

Holiday Shopping Made Easy

FALL INTO SAVINGS

Save Up To $80 Off!

BACK-TO-BACK WINS UNLOCK THE NO. 19 FREE BIRD LIVERY

Limited-Time Pre-Order Ends In:

GREAT GIFTS UNDER $100

Holiday Shopping Made Easy

Discontinued

Losi MS20DSL Servo with Saver & Long Lead

Losi - LOSB0813

Losi MS20DSL Servo with Saver & Long Lead Product Specs

  • Gear TypePlastic
  • Servo Size CategoryMini and Micro